TOWN PARK PLAZA

Phase 2: Shade structure replaces colorful umbrellas

Town Park Plaza’s planned shade structure became Phase 2 of the project, as the Town was not in a position to match the CMCFoundation’s allocated funding in 2013.  Phase 2 was accomplished in 2018, as described in the attached newspaper articles linked here.

CLICK IMAGES TO ENLARGE

Plaza Shade Structure Dedication:
Jared Barrilleaux (Senior Engineer), Bob Ravasio (Mayor), Jana Haehl (Plaza Coordinator), Rich Perlstein (Architect)

In April 2021, we again partnered with the Town to add a retractable shade awning and drop-down roller shades to the trellis built in 2018 as Phase 2 of Town Park Plaza.