March 2010 -  The initial order of 123 commemorative inscribed bricks were installed in the new floor of the patio.  The curved landscape wall and a natural rock fountain were completed as a backdrop for the turf area that would soon be installed.  As the deck moved toward completion, plans were made to improve passage from the patio into the building.  (Click here to see what came next.) Patio_Project_Update_4.htmlshapeimage_1_link_0
 

19

Daniel from

Green Team

cuts bricks

to fit layout

pattern

18

Kim Baez,

Alan Best,

and Mike

Moncayo

haul beams

20

Shaun trims capstones

for landscape wall

 

21

Oscar Edwards and Kim Baez work on support for deck

22

Alan Best,

Bob Bundy

and Bill

Moore pour

stair

footing

24

Kim Baez

cuts beam

while Robin

Moller holds

it in place

25

Meredythe Medigovich is there to help

23

Bob Bundy and

Oscar Edwards

bring in the

Trex decking

27

Vaso

Medigovich

and Mike

Moncayo

install

decking

17

Rigo from

Green Team installs

inscribed

bricks