January 2010 - Here’s what our community volunteers did to get the project underway:  The old, deteriorated deck was removed, along with two trees that were a potential hazard. Joists and beams were salvaged for use in constructing a new, smaller stage area.  Debris was hauled away, and the area was graded for installation of brick pavers on a level floor area.  A landscape-and-seating wall was constructed adjacent to new turf.  (Click here to see what happened next.)                                        Patio_Project_Update_2.htmlshapeimage_1_link_0
 

1

Trees Removed

2

Old Decking     Pulled Up

3

Joists Dismantled and Salvaged

4

Volunteers Taking a   Lunch Break

5

Old Deck Supports Removed

6

Tree Roots Pulled Out

7

New Patio Floor Cleared

8

Ramp Wall Removed